Category: Traffic
Accident reported on southbound I-635 near Metropolitan
Several highway and road projects scheduled here
Several highway maintenance projects are scheduled in Wyandotte County, according to the Kansas Department of Transportation.
Information from KDOT about upcoming highway and road projects:
In a May 18 project, the northbound I-635 ramp to eastbound I-70 will be closed. The right lane will be closed for eastbound I-70 at Park Drive.
The closures will allow for bridge inspection on eastbound I-70 at Park Drive, with work scheduled from 9 a.m. to 2 p.m. May 18.
KDOT construction projects affecting traffic include the 7th Street, U.S. 169 Herman Dillon bridge replacement project. Northbound 7th Street is closed southbound over the Kansas River in an ongoing project that began April 12. Truss and expansion joints are being repaired. Work is occurring during daytime hours, Monday through Friday, with completion scheduled in mid-June.
Ongoing Unified Government roadway construction continues on Leavenworth Road from 78th Street to 63rd Street. Work is occurring from daylight hours through Dec. 10. Two lanes are being reduced to one lane during this project. Grading, surfacing and storm sewer work is included.
A bike and pedestrian path project continues on Strong Avenue from 42nd to 24th streets, along 24th from Strong to Metropolitan Avenue, and along Metropolitan from 24th to 12th.
Work is occurring from 7 a.m. to 6 p.m. Monday to Friday and Saturdays as necessary, with project completion expected at the end of May.
Curb and sidewalk construction will begin on the south side of Strong Avenue between 36th Street and 25th Street, where on-street parking will not be allowed, the sidewalk is closed and pedestrians are detoured to the north side of the road. Once the south side is completed, construction will begin on the north side of Strong. Parking will not be allowed in designated areas during construction.
I-670 bridge replacement on Missouri side could affect area traffic
The Baltimore Avenue and I-670 bridge replacement May 20-24 in Kansas City, Missouri, could affect some motorists’ travel plans, according to the Kansas Department of Transportation.
The Missouri bridge replacement project plans demolition to begin May 20. Completion of the project is scheduled for December 2021.
The bridge will require the total closure of I-670 between I-35 and I-70 on the south side of the downtown loop from 8 p.m. Friday, May 21, to 5 a.m. Monday, May 24, according to the Missouri Department of Transportation.
Several ramps will be closed for this project from May 21 to May 24, including the ramp from northbound I-35 to eastbound I-670; ramp from southbound I-35 to eastbound I-670; Truman Road ramp just past Broadway to eastbound I-670; ramp from Wyoming Street to eastbound I-670; ramp from eastbound I-70 to westbound I-670; ramp from northbound U.S. 71 to westbound I-670; ramp from 10th St. to westbound I-670; and ramp from westbound I-70 to westbound I-670.